Concrete Calculator

Estimate ready-mix volume and bags for rectangular concrete pours.

Project dimensions

20 ft10 ft4 in

Your estimate

Concrete required

2.716 yd³

Volume before waste
66.667 ft³
Bags required
123 bags
Ready-mix material cost
$407.407

Illustrative defaults, not market quotes. Verify supplier quantities and local requirements. Not structural design advice.

How to use this calculator

For multiple different shapes, calculate separately and sum unrounded volumes before ordering.

Calculation formula

Volume = length × width × thickness ÷ 12 × quantity.

Worked example

Using length 20 ft, width 10 ft, thickness 4 in, waste allowance 10 %, material price 150 $/yd³, bag yield 0.6 ft³, quantity 1 , the estimate is 2.72 yd³ (concrete required); 66.67 ft³ (volume before waste); 123.00 bags (bags required); 407.41 $ (ready-mix material cost).

Can I use this as a purchase quote?

No. Verify supplier minimums, product specifications, taxes and additional work before ordering.

Related calculators

Concrete Slab Cost CalculatorFence Post Concrete CalculatorSonotube Concrete CalculatorConcrete Block CalculatorConcrete Footing CalculatorConcrete Slab Calculator